Lettuce Production Practices and Sample Costs
Table 5. HOURLY EQUIPMENT COSTS BASED ON WHOLE FARM OPERATION
Coachella Valley-1996
|
|
COSTS PER HOUR |
|
Non-Cash Overhead |
Cash Overhead |
Operating |
| |
Actual
Hours
Used |
Deprec-
iation |
Interest |
Insur-
ance |
Taxes |
Repairs |
Fuel &
Lube |
Total
Oper. |
Total
Costs/
Hr. |
| 90 HP 2WD Tractor |
914.60 |
1.72 |
0.51 |
0.09 |
0.13 |
2.10 |
5.59 |
7.69 |
10.13 |
| 97 Cultivator - 2 Row 40" |
60.50 |
2.53 |
0.93 |
0.17 |
0.23 |
1.22 |
0.00 |
1.22 |
5.07 |
| 97 Disc - 18' Offset |
157.00 |
3.33 |
1.22 |
0.22 |
0.31 |
4.17 |
0.00 |
4.17 |
9.24 |
| 97 Lister - 3 Row 40" |
23.80 |
2.42 |
0.89 |
0.16 |
0.22 |
0.46 |
0.00 |
0.46 |
4.15 |
| 97 Pickup - 1/2 Ton |
267.00 |
4.76 |
0.81 |
0.15 |
0.20 |
2.92 |
2.88 |
5.80 |
11.72 |
| 97 Plastic Mulch Layer |
126.50 |
1.28 |
0.47 |
0.08 |
0.12 |
1.29 |
0.00 |
1.29 |
3.24 |
| 97 Plow - 3 bottom |
131.90 |
1.53 |
0.56 |
0.10 |
0.14 |
1.61 |
0.00 |
1.61 |
3.94 |
| 97 Puncture Wheel |
27.00 |
0.33 |
0.10 |
0.02 |
0.02 |
0.05 |
0.00 |
0.05 |
0.52 |
| 97 Sprayer - 200 gal |
240.00 |
0.88 |
0.21 |
0.04 |
0.05 |
1.96 |
0.00 |
1.96 |
3.14 |
| 97 Triplane - 12' |
34.60 |
14.16 |
5.19 |
0.93 |
1.30 |
1.97 |
0.00 |
1.97 |
23.55 |
Back to "Eggplant Production Practices and Sample Costs" Page
Table 1 Table 2 Table 3 Table 4 Table 6
"Production Practices and Sample Costs" Home Page